
Panoramic View
On November 10th, the continuous annealing project of Baogang 2030mm Cold Strip Mill constructed by MCC5 Group Shanghai Corp. Ltd. won the "2016-2017 National High-Quality Project Award". The National High-Quality Project Award for construction industry is the earliest and highest national quality award. It is recognized as quality brand symbol and corporate reputation symbol by the society and construction industry.
The continuous annealing project of Baogang 2030mm Cold Strip Mill consists of two continuous annealing production lines with separate annual outputs of 900,000 tons and 630,000 tons.
It is reported that the project has also won the “National Metallurgical Industry Excellent Design Award”, “National Metallurgical Industry High-Quality Project Award”, Shanghai "Shen\'an Cup" High-Quality Project Award, and Shanghai Engineering Construction Excellent QC Achievement (2nd Prize). This project has also obtained one ministry-level construction method for metallurgical industry, and has applied for 4 invention patents (accepted). The project department has been awarded "Advanced Unit of Quality Management" and "Advanced collectives" by the construction department of Baogang (group) Company for many times.
(Reported by: Jiao Langting, Xu Shuxian)